| [PHYSICAL] Cards alignment | Orange | To do | Ed |
| [PHYSICAL] Smaller fonts | Orange | To do | Ed |
| Admin can create mulitple boards per project | Yellow | To do | Mae |
| Admin can modify (add, edit, delete) columns based on the needs | Yellow | Done | Mae |
| asdadas | Orange | Doing | |
| Auto generation of task number | Yellow | To do | Mae |
| Create Scrumboard should be only for Admin | Yellow | Doing | Mae |
| Creation of roles (Admin and User Only | Yellow | To do | Mae |
| Only scrumboards tag to a user should be visible to the user | Yellow | In testing | Mae |
| Revision history should be visible on the task card upon opening | Yellow | Doing | Mae |
| Tagging of Scrumboard per role | Yellow | Doing | Mae |
| Task card should have the ability to create a checklist inside of it. | Yellow | In testing | Ed |
| Task should have the following params:<br/>1. Epic<br/>2. US<br/>3. Acceptance Criteria<br/>4. Due Date | Yellow | Done | Mae |
| User can attach file. | Yellow | Doing | Ed |
| User should be able to add comment via comment box | Yellow | In testing | Mae |